Pages

Monday, September 2, 2013

August finish

August was a busy month, having company for several days and then going away for a wedding. As a result, I didn't get much accomplished on my to do list.

I was able to finish the eight pillowcases. YEA!!!! They are finally off the backs of the chairs in my craft room. It looks neater already!



I am linking this up to A Passion for applique's Nothing but UFOS in 2013 challenge and She can quilt for the 2013 Finish along.

Thursday, August 1, 2013

More August goals

I just came across the blog A passion for applique and her Nothing but UFOS in 2013 challenge.  I love these challenges because they force me to stick to and complete some of the projects I start and set aside. So, my three goals for August are:

1. These eight pillowcases I have had cut out since December. They are currently hung over the backs of the chairs in my craftroom.


2.  A rag quilt I started last year.

3.  This quilt needs to be quilted and bound. I just keep using this picture-because I miss this sweet girl!

Wednesday, July 31, 2013

August goals

For A lovely year of finishes, my goal is to complete these eight pillowcases that have been cut out and draped over the chairs in my craft room, since December!


July finish

I finished this rag quilt just under the wire!  I finished ragging the edges a couple hours ago and was able to snap a picture before the sun went down!  It hasn't been washed yet, so the edges aren't all curled yet. I finished in time to link up to A lovely year of finishes and also the  2013 Finish-along. Here is the link to my "to-do" list for the quarter To do list


Monday, July 15, 2013

Q3: 2013 Finish Along

Here is my to do list for the third quarter of the 2013 Finish Along. Most of the list is a continuation from the last two quarters.  Hopefully I will get several of these completed...though there are several new things I want to work on too! :)


1. I did add my Scrappy Trip Along strips. These have been cut since I first discovered the Scrappy Trip Along craze on Flickr--back in January!  These strips have been moved from the chair in my craft room to the guest room, back to the craft room when guests arrived and now, I want to actually work on it!

                                                
2.  A flannel rag quilt that needs to be pieced and ragged! LOL  This one is just to have on hand for those new babies.


3.  A lap quilt from a pattern titled Three Bean Salad by Miss Rosie.  I loved the colors of the sample so much, I decided to replicate them!  This is partially pieced, one I usually take to the guild sewins.


4. Eight flannel pillowcases I am in the process of completing for our Guild charity.  Pictured here are the main part of the pillowcases. I was in the middle of cutting them out, but set them aside to work on the baby quilt listed in number one.


5. A quilt top made during Pleasant Home's Sew Scraps Along 2012. The top is actually all pieced, I just love this picture, so I need to quilt and bind it.


6.  A quilt top started during Thought and Found's Oh my stars BOM last year. I only have about eight of the fifteen LARGE stars completed.


7. I hand pieced this sampler over 17 years ago. It was a class I took to occupy my time while my husband (then boyfriend) went away to college. It needs to be quilted and bound.


8. I actually bought this top at a auction my guild held.  However, I want to do some redwork in the open blocks and then quilt and bind.

9.  I finished this top in February. Now it needs to be quilted and bound.


10. Another rag quilt I had cut and set aside. I really hope to finish this and the girly one above before a great niece or nephew is born this summer.

Wednesday, July 3, 2013

Second quarter finishes

I started out a little better this quarter....though personal events derailed my sewing goals.

I ended up finishing my Dilly Dally quilt and the baby quilt.  Little did I know that only a month later we would be saying goodbye to the sweetest kitty, pictured below.  I will cherish the pictures I took of her on this quilt while I was working on it.




I am linking this post to the second quarter for 2013 Finish Along.  Here is the list I posted at the begining of the quarter Q2 to do list.

Monday, June 3, 2013

June goal AND now, July goal

Edited July 5, 2013: Since June ended up being a horrible month for my little family-I didn't get any sewing done. Thus, I am submitting this flannel quilt as my July goal also.

For the month of June, I hope to finish this flannel rag quilt. It is all cut out and I have four rows together so far. This one of for a nephew and his wife, who are expecting a wee one any day now!  I originally didn't plan the blue, but think it adds a nice touch.


I am hoping to complete this for A lovely Year of finishes and the 2013 Finish along.